Qualification intake

Start ITAD review.

This is the primary intake. It captures the asset mix, location count, timing pressure, storage media presence, battery exposure, and the operational context around the load.

01

Review the mix

Laptops, desktops, monitors, switches, firewalls, access points, and server-room leftovers.

02

Flag sensitivity

Storage media, regulated environments, and batteries/UPS units get identified before the handoff.

03

Determine path

No-cost qualifying removal, recovery-oriented path, or a more structured disposition path.

04

Move deliberately

Nothing about this lane is positioned like random pickup. The tone is controlled from the first step.

Command Surface

Primary review intake

Give us enough detail to tell you whether the load fits a no-cost qualifying removal path, a recovery path, or a more structured downstream lane.